Saturday, April 27, 2024

Assabet River - Maynard to West Concord

Nice spring trip down the Assabet River through downtown Maynard rapids into West Concord. Water levels were good, 261 cfs, 2.8 ft on the Maynard gauge. Scraped bottom a few times through Maynard but there was enough flow to get through without major issue. The biggest drop was under the very first bridge (Great Road / Rt 62), followed by a lot of Class I and quickwater until the Waltham St bridge Class II finale. A guy walking his dog across that bridge stopped to see how I'd do, I made it through with just a few scrapes. One portage on this trip, left around the Powder Mill Dam which was flowing fast and furious. The rest of the trip was quickwater to the very muddy Pine Street takeout.  Saw two fly fishermen in Acton. Many turtles were out sunning today.  

Start: Ben Smith Dam, Maynard, MA
End: Pine St Bridge, West Concord, MA
Trip Time: 1 hour 45 minutes 
Trip Distance: 5 miles


Put-in below the Ben Smith Dam

Great Road (Rt 62) bridge, I went right this time

Newly rebuilt (2023) Florida Road bridge 



Heading into downtown Maynard under the Assabet River Rail Trail then Main St bridges

Some outflows here and there but the river smelled fine on this day

Turtle time!!

looked like an abandoned kayak and a clear glass time machine above it

Powder Mill Dam in Acton, from above..

.. and below


A video to capture the flow and sound: 


Getting back onto the river below Powder Mill, had to drag/ferry to the right side of that abutment

Damon Mill looking stately in the sun

The mill race below Damon Mill

The muddy takeout at Pine Street.  River was sparkling 




No comments:

Post a Comment